Monday, December 22, 2025

Repairing the fenders on Oddesundbroen (the Oddesund Bridge)

 I was asked by a friend who runs a commercial diving company, if our company could help in making new fenders for Oddesundbroen. 

He said that the job was so unorthodox, that he immediately thought that we would be the right ones to do it. The thing is that the fenders are made out of wood, and since the base pillar of the bridge is round, the fenders had to be sawed out to a 15 foot radius, and they had to be made out of 10" thick azobe / ekki (tropical hardwood).

There were also some smaller parts that needed to be mounted, but they were just made from straight pieces, so they weren't equally challenging.

The first step was to make a template so I had something that I could use for marking out the fenders. 
The template was then placed on top of the azobe planks 10 " x 20" x 10feet

The newly purchased Mafell ZSE330K was originally purchased with this specific project in mind, and performed brilliantly. 
Given that the wood was so thick and hard, I found out that by attaching an elastic securing strap to the saw and to the end of the wood, it would help by giving a fixed pull, so I didn't have to push quite as hard to saw the curve. Every now and then I would reposition the elastic strap another 8" to make it smooth.

When all the pieces were made, I helped installing it at the bridge.
The entire project had been a little delayed due to the delivery of the wood as far as I have understood, so we were challenged by having to do the actual mounting in November which is not the optimal month for outdoor working in marine environments.

The diving company had deployed a working barge, a small work dinghy and a work boat for the job. The barge had a small tool storage shed/ workshop onboard, and a hydraulic crane plus a generator.
The work boat would tow the barge out to the bridge, and we would secure it to the bridge pillar and get to work. 
The waves, heavy current and tide were all factors that we tried to work around. Some days the wind and waves would make it impossible to work safely, and then we'd try to do some preparing in the small harbour, and other days we just had to cancel it all.

We had completed the hinged bridge pillar part of the project, but the abutment pillar still had to be re-fendered. I had helped in removing a lot of the old wood fenders on that, and the old rubber fenders as well.
Sa
dly, the weather turned so bad in the end of November, that I was unable to see the project completed since I had to return to sea and my regular job. 

All in all a very challenging and satisfying project to have worked on.

Going through my pictures, I can see that I forgot to take any of the newly installed curved fenders.

Sawing the curved fenders


The first curved fender.

Mafell ZSE 330K, a fantastic tool.


Oddesundbroen

The state of somne of the old vertical fendering.

New fender planks, new galvanized chain and new fender rubber.

View from the abutment pillar, still early in the project.
On the right side some of the curved fenders are missing.

A rare day with sunshine and low winds.

Working on replacing the vertical fender planks.

Opening of the bridge

Passing of the Poul Løwenørn